The Client required the design and construction of 39 bearing piles to support a multi-story student accommodation/hotel building located at Spring Mews, London.
CLIENT Spring Mews LTDCONTRACTOR Oakdean ConstructionENGINEERCurtinsSCOPE 39 no. 600mm SFA bearing pilesPLANTSoilmec SM-16Putzmeister 2005 concrete pump
35 piles were to be constructed inside an existing secant-piled excavation. The site constraints necessitated the craning of the piling rig from the adjacent road into the excavation.
The upper 4.5 metres of material comprised highly variable made ground. This was underlain by the Kempton Park Gravel member, which extended to a depth of approximately 8.0 metres below ground level. The Kempton Park Gravel member was subsequently underlain by the London Clay formation.
The bearing piles within the excavation were designed to diameters of 600mm, with lengths ranging from 22.2 to 24.9 metres below the existing excavated formation level. All the piles were founded into the London Clay formation. The method for the installation of the piles was sectional flight auger (SFA) execution using a Soilmec SM-16. The rig was successfully craned into the excavation, and the execution proceeded with a continuous supply of concrete being pumped from the adjacent road above the excavation. Steel casing was installed through the gravels during the construction of each pile to enable open boring during the extraction and concreting operations.

Case Studies
Central Piling has completed a piling contract to enable essential homes to be built for residents in Tilbury, Essex.
Case Studies
Central Piling has completed a major piling contract that is enabling King’s College London to build new high quality student accommodation in southeast London.
Case Studies
Central Piling enabled construction to begin on a major regeneration scheme that will bring much-needed housing and amenities to a former industrial area in Luton.
Case Studies
Central Piling has played an important role in helping one of the UK’s leading housing companies regenerate a former industrial site for much-needed housing and amenities. The Hyde in north London is a landmark development of 387 homes (including 139 shared ownership and 34 affordable rent) and 647m2 of community facilities and commercial space.
Case Studies
As part of the redevelopment of Galliard Homes a new residential Development is to be developed.
Case Studies
The client required a basement to be constructed as part of the works at Barking Road. To enable this it was considered that, due to the high ground water table, a secant piled wall was the best solution.
Case Studies
The challenge of this project was to form a double basement underneath and to the rear of this listed building in order that a swimming pool and gym area could be provided. Access for all equipment was restricted to 1.8m width and in some areas 2.5m in height.
Case Studies
The challenge of this project was to form greater/larger space within a confined space in a listed building to provide banking financial services. Access for all equipment was restricted to 1.8m width and in some areas 3.5m in height.
Case Studies
Piles were required for abutments for a new bridge across the river Blakewater in the northwest of England.
Case Studies
As part of the redevelopment of Epsom Downs Racecourse a new grandstand is to be constructed.
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |