The challenge of this project was to form a double basement underneath and to the rear of this listed building in order that a swimming pool and gym area could be provided. Access for all equipment was restricted to 1.8m width and in some areas 2.5m in height.
CLIENT Workspace Group PLCCONTRACTORHG ConstructionENGINEER Thornton TomasettiSCOPE118 no. 600mm CFA bearing piles 8 no. 600mm CFA tower crane base pilesPLANTSoilmec SF-65 7.0m3 Hymix concrete agitator Putzmeister 2005 concrete pump
Ground Conditions Due to the stiff and dry London clay a contiguous piled wall formed using a rotary technique was determined as the most cost effective solution to form the retaining wall.
The close proximity of the neighbouring structures and the large retained height meant that the 450mm diameter piles placed at 550mm centres needed to be propped in the temporary condition. The reinforced concrete wall and slabs would provide support in the permanent situation. The existing property was in some areas supported by piles that will act as columns and have a free standing height of up to 6m. Therefore additional reinforcement bars were supplied to cater for bending that may be induced.
Case Studies
Central Piling enabled construction to begin on a major regeneration scheme that will bring much-needed housing and amenities to a former industrial area in Luton.
Case Studies
Central Piling has played an important role in helping one of the UK’s leading housing companies regenerate a former industrial site for much-needed housing and amenities. The Hyde in north London is a landmark development of 387 homes (including 139 shared ownership and 34 affordable rent) and 647m2 of community facilities and commercial space.
Case Studies
As part of the redevelopment of Galliard Homes a new residential Development is to be developed.
Case Studies
The client required a basement to be constructed as part of the works at Barking Road. To enable this it was considered that, due to the high ground water table, a secant piled wall was the best solution.
Case Studies
The challenge of this project was to form greater/larger space within a confined space in a listed building to provide banking financial services. Access for all equipment was restricted to 1.8m width and in some areas 3.5m in height.
Case Studies
Piles were required for abutments for a new bridge across the river Blakewater in the northwest of England.
Case Studies
As part of the redevelopment of Epsom Downs Racecourse a new grandstand is to be constructed.
Case Studies
Crossrail required large diameter bearing piles in restricted access adjacent to the Stepney Green Shaft which provides ventilation to the underlying tunnel approximately 30m below ground level.
Case Studies
The construction of a multi-million pound office development by Wates Construction in Cambridge Brookgate’s 22 Station Road scheme, a £33m five-storey development of 64,770 sq ft office space.
Case Studies
The Client required the design and construction of 118 bearing piles to support a five-story mixed use commercial building (with basement) located at 1 Phipp Street, Shoreditch, London.