The proposed development was the construction of a high-rise residential building of eight-storey in height.
CLIENT London Borough of HackneyCONTRACTOR Higgins Construction PLCENGINEER Tully De’Ath ConsultantsSCOPE 491no. 300mm and 350mm diameter CFA bearing piles to 22.9m depthPLANTSoilmec SF-50 40t Drilling Rig Concrete pump and agitator
The high loads including tension forces meant that piles were required. Due to the presence of residential developments and offices in the area, CFA (continuous flight auger) piles were preferred as for this installation method the noise and vibration are significantly reduced compared to other methods.
The upper 7.0m was found to be fill underlain by a stiff London clay layer to 19m and a very stiff layer of Reading Formation Clay down to 25m.
The proposed solution was to adopt a design for the piles using Eurocodes design allowing for load tests on both preliminary and working piles. 300mm and 350mm diameter continuous flight auger (CFA) piles were installed down to 23m depth.
Concrete used was C28/35 DC-3 and the reinforcement for the piles is 4H16x8m in a H8 helical with 150mm pitch for 300mm piles and a pitch of 200mm for the 350mm piles. For the piles with tension loads, a central bar was added 1H32x16.
Case Studies
Central Piling has completed a piling contract to enable essential homes to be built for residents in Tilbury, Essex.
Case Studies
Central Piling has completed a major piling contract that is enabling King’s College London to build new high quality student accommodation in southeast London.
Case Studies
Central Piling enabled construction to begin on a major regeneration scheme that will bring much-needed housing and amenities to a former industrial area in Luton.
Case Studies
Central Piling has played an important role in helping one of the UK’s leading housing companies regenerate a former industrial site for much-needed housing and amenities. The Hyde in north London is a landmark development of 387 homes (including 139 shared ownership and 34 affordable rent) and 647m2 of community facilities and commercial space.
Case Studies
As part of the redevelopment of Galliard Homes a new residential Development is to be developed.
Case Studies
The client required a basement to be constructed as part of the works at Barking Road. To enable this it was considered that, due to the high ground water table, a secant piled wall was the best solution.
Case Studies
The challenge of this project was to form a double basement underneath and to the rear of this listed building in order that a swimming pool and gym area could be provided. Access for all equipment was restricted to 1.8m width and in some areas 2.5m in height.
Case Studies
The challenge of this project was to form greater/larger space within a confined space in a listed building to provide banking financial services. Access for all equipment was restricted to 1.8m width and in some areas 3.5m in height.
Case Studies
Piles were required for abutments for a new bridge across the river Blakewater in the northwest of England.
Case Studies
As part of the redevelopment of Epsom Downs Racecourse a new grandstand is to be constructed.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |